Field note 05 · Cost

Fullerton ADU cost depends on the work in the bid.

An online price band cannot see the house, utility routes, finish selections, or City comments. A working budget separates priced work, allowances, owner purchases, and items that still need investigation.

01 · Budget structure

Keep unlike costs in separate columns.

Design and engineering

Existing-condition documentation, design, consultant work, energy documentation, and coordination.

City and agency

Application, plan review, permit, impact, utility, and other applicable charges—verified for the actual project.

Utilities and site

Trenching, connections, service capacity, drainage, access, demolition, protection, and restoration.

Construction and finish

Structure, envelope, systems, interiors, fixtures, selections, and documented allowances.

02 · Comparison test

Compare inclusions before totals.

CheckWhat clarity looks like
Scope boundaryIncluded work, exclusions, and owner responsibilities are named.
AllowanceThe item, amount, selection responsibility, and adjustment method are visible.
Site assumptionAccess, soil, utilities, existing conditions, and protection assumptions are stated.
Revision milestoneThe proposal says when drawings, selections, or agency responses will refine the number.

03 · Contingency logic

Unknown is a category—not a promise.

Contingency should respond to the project’s level of documentation and risk. It is not a substitute for investigation, and this site does not provide a project price or financial advice.

City-cost checkpoint

Use Fullerton’s current applications and fee resources for live City information. Ask the applicable departments or utilities about project-specific charges rather than copying an old fee from another property.

04 · Complete project budget

Keep the costs outside the building bid visible.

Owners may pay for survey work, design, engineering, energy documentation, agency fees, utility coordination, testing, title or property research, and owner-selected products in addition to the contractor’s construction scope. Which items apply depends on the property and agreement.

Ask every bidder to state whether demolition, hauling, temporary protection, trenching, service upgrades, grading, drainage, landscape repair, appliances, window coverings, and final cleaning are included. Record the tax, delivery, installation, and markup treatment of allowances.

A contingency is easier to size after open risks have been listed. It does not make undefined work disappear. Update the budget when drawings change, a utility answer arrives, a selection exceeds its allowance, or field investigation changes the scope.