Estimate note · Preparation

Prepare for a Fullerton ADU estimate that can be compared.

An estimate improves when everyone prices the same drawing and work. Call (714) 515-6245 after gathering the information you have; missing items can become a clear investigation list.

01 · Property file

Start with the address and existing conditions.

Collect a survey if available, assessor or permit records, photographs, rough measurements, and information about garages, additions, easements, pools, trees, slopes, and access.

Tell the contractor which facts are confirmed and which are homeowner recollections. That distinction helps prevent assumptions from hardening into a price.

02 · Drawing status

Name the exact version being priced.

If plans exist, identify their date, revision, consultant set, and City status. Include correction notices and utility correspondence that may change the construction work.

If there are no drawings, describe the intended use, rough size, bedroom count, accessibility needs, privacy priorities, and preferred level of finish.

03 · Bid comparison

Ask every bidder to show the gaps.

Look for design and permit coordination, agency fees, utility work, site preparation, demolition, structure, systems, fixtures, allowances, exclusions, protection, cleanup, and closeout.

A low number with many undefined items is difficult to compare with a detailed scope. Ask what could trigger a change and how that change would be documented.

Continue the research

Use the next guide when the question changes.

These pages cover the parts of a Fullerton ADU job that connect directly to this topic.

Agency information

Public rules and forms change. Reopen the agency page when this work is being planned.

Speak with the local team

Your property tells us where to begin.

Have the address and intended use ready. Existing structures, access, utilities, and the permit stage help us make the conversation specific.