Detached ADU construction
Get the Fullerton details for this part of the project.
Field note · Site work
The shortest line on a sketch is not always the right connection. We look at capacity, route, grade, existing surfaces, access, provider requirements, and who is responsible for each decision.
01 · Utility routes
Sewer slope and connection location, water size, electrical service capacity, gas decisions, communications, heating and cooling, and drainage all affect the plan.
A contractor can help coordinate the questions, but utility owners, designers, engineers, or inspectors may need to make the determination. Keep those tasks visible.
02 · Construction access
Gate width, side-yard clearance, steps, overhead wires, driveway turns, slopes, trees, walls, and occupied spaces determine how work reaches the backyard.
Restricted access can change excavation, concrete placement, hauling, material size, labor, and the area needed for safe staging.
03 · Water and grade
Record existing flow paths, low points, roof discharge, retaining, and paved areas before changing the site.
Drainage design is project-specific. The scope should show who designs it, what is built, and which disturbed surfaces will be restored.
04 · Bid checklist
List trench lengths, assumed depths, connection points, service upgrades, patching, landscape removal, tree protection, hauling, and replacement work when known.
When they are not known, state the investigation or allowance clearly. That is more useful than hiding uncertainty inside one site-work number.
What to review next
Use these Fullerton guides to connect this decision with cost, permits, design, or field work.
Get the Fullerton details for this part of the project.
See how this question changes the proposed work.
Prepare the information needed for that review.
Get the Fullerton details for this part of the project.
Agency information
Agency requirements can move. Check the source again when the project reaches this decision.
Before you price it
Describe the existing house, yard access, and intended use. We can point out the records and field conditions that belong in the estimate.